Saturday, September 19, 2009
Saturday, September 12, 2009
19.09.09 Meeting?
SP called me up is it possible to change our meeting date to 19.09.09 morning? I have not decided and once I have make up my mind I will give him a call.
HG Order?
Some one has approached me about the VT software. Which I said I am sorry that I can't simply give away for free.
HG Line 35
Line35 wanted to start up production, but there are lot of things not done yet:
The neck ring not squared, the blow head mechanism no cushion, the funnel mechanisms no cushion, the feeder plunger needs a line to the plunger spring cylinder, and the shear air spring cylinder not mounted, the scoop water cooling, the 90 degree pusher not on the 90 angles.
The neck ring not squared, the blow head mechanism no cushion, the funnel mechanisms no cushion, the feeder plunger needs a line to the plunger spring cylinder, and the shear air spring cylinder not mounted, the scoop water cooling, the 90 degree pusher not on the 90 angles.
Friday, September 11, 2009
Line 34
The production of 500 ml on this line was bad, because the machine condition was very bad shape.
Strike Make The Meeting Unreal
Because of the pilot went on strike, it has make our meeting unrealistic.
Saturday, September 05, 2009
500 ml Bottle
The production of this bottle I used 500 instead of 470 degrees of process time to produce a good bottle.
Friday, September 04, 2009