Sunday, December 27, 2009

To Night

We had a gethering in Tun Ahminah for Chinese tea, talking about Chinese tea, it used to be either beer or brandy in the party, but now we are old and two can't drink any beer or brandy because of medical problems.

Sunday, November 22, 2009

Not Going Home

I have decided that I am not going home instead staying back till 26.11.09 for next treatment before I could go to Egypt.

Thursday, November 12, 2009

Trying for New Job

JCL Mr. JJ Jow agree to consider me a job.

Saturday, November 07, 2009

BlackBerry

I got one BlackBerry from Mr. ND. Haldyn on 20.08.09.

Ass Hole

Everybody has an ass hole but I have 4 holes in my ass.

Sunday, November 01, 2009

No Work!

What to do next? Go out and looking for job!

Tuesday, October 27, 2009

Germany - Inspection

The machines I inspected look ok. but some of the parts were already obselted like hydralic Gob Distributor and pushers.
What to do?

Saturday, October 17, 2009

25 - 29 Germany

It has been set 25th of October 2009 till 28th of October 2009 are the dates to go Germany for machine inspection.

Monday, October 12, 2009

500 ml Coke

From CG he came and asked about the weight of 500 ml coke.
I got the Parison layout drawing from DH and told him the weight is 415 grams.
Mean time I told him that for the start, it would be better to maaintain the weight and could be reduced later.

Sunday, October 11, 2009

News From India

There was news from HG that the said machine 35 was running OK, so he said it has to take some time for him to think over which I think it is very slim.

Saturday, October 10, 2009

Still No News

Queit from India!

Taiwan - Germany

I have a good news, Euro 6000.00 going to Germany for 5 days, I have to buy a business class to and fro ticket for used machines and parts inspection and negotiation.

Tuesday, October 06, 2009

Very Quiet

Very quiet either from India nor Taiwan. I wonder what has happened.

Saturday, October 03, 2009

Germany?

When will be the trip start? When will be the money arrive? When?

Saturday, September 19, 2009

HG

In this glass plant, what shall I do? To train some of his people and pick some of the best people? Can I?

SG

Went to SG to see that they would not talk about buying my Ds.

Going Home!

It is so nice to go home.

Saturday, September 12, 2009

19.09.09 Meeting?

SP called me up is it possible to change our meeting date to 19.09.09 morning? I have not decided and once I have make up my mind I will give him a call.

HG Order?

Some one has approached me about the VT software. Which I said I am sorry that I can't simply give away for free.

HG Line 35

Line35 wanted to start up production, but there are lot of things not done yet:
The neck ring not squared, the blow head mechanism no cushion, the funnel mechanisms no cushion, the feeder plunger needs a line to the plunger spring cylinder, and the shear air spring cylinder not mounted, the scoop water cooling, the 90 degree pusher not on the 90 angles.

Friday, September 11, 2009

Line 34

The production of 500 ml on this line was bad, because the machine condition was very bad shape.

Strike Make The Meeting Unreal

Because of the pilot went on strike, it has make our meeting unrealistic.

Saturday, September 05, 2009

500 ml Bottle

The production of this bottle I used 500 instead of 470 degrees of process time to produce a good bottle.

Friday, September 04, 2009

Some One Wants To Buy!?

I think if I don't sell, then it is a waste, right?

Thursday, August 27, 2009

KIG Surabaya

I just heard that two days ago they caught fire.

Umbra - Surabaya

We met today and explained about IS machine to Umbra, I think they don't have the market of bottle and they have to wait unit 2 years unit first 80ton furnace has commissioned and then they will turn the second furnace in amber then they would consider IS machine.

Sunday, August 23, 2009

BBC

To see Saiful? So much questions to ask, who is he? How is he? Ladies Miss Anna, and Ms Chen Miew Fung? Who are they?

Friday, August 21, 2009

Idle

Must be very careful.

Thursday, August 20, 2009

Indonesia Tour

Hoping that when I came back from Indonesia tour, I can have some concrete idea of what to do next.

Monday, August 17, 2009

Germany?

Going to Germany for an inspection of an IS machine? With Fomosan Glass people.

New Audit

An offer came from India again, this time is to go the glass plant to do plant and machinery audit.

Hope that it will comes true.

Friday, August 14, 2009

Glass Plant

I dreamed of having a small glass plant or sharing with some others. I told this to Mr. Hubert Yen, and he seems quite like my dream.

sk

This morning we had had a cold war!

Thursday, August 13, 2009

Wait

Just waiting for the quotation.

Wednesday, August 12, 2009

East Job?

Went to MG with Hubert Yen this afternoon to meet KT Foo, in the meeting Foo told me tha he has been called by Gorge Baruch to work with him in the Egypt. But due to his long period in MG so he dare not resign so I asked him to give me a trial??

Tuesday, August 11, 2009

Jg

Today we quoted a 6 sections machine with servo gob distributor (Overhauled), T300 timing control, 317 pusher & 5 drive motors for 2.5 million ringgit.
Inside my hearth I felt guilty towards KK. Hope he will understand and forgive me

Sunday, August 09, 2009

Good Idea!

SK just come and tells me that I am going to tell KK Wong to help me to access about Mr. Hubert Yen case, as a second option.

My Dream!?

I hope that is not a dream but I dream to make IS machine.

New Idea?

I was asked to fly to Taiwan to see for myself by JYH-LIH Young boss Mr. Hubert Yen. To my surprise, I saw with my own eyes one IS made by him is producing beer bottles in Taiwan Government glass plant. Even though some of the electronic timing control and pusher and drives are not him. But it works.

Sunday, July 19, 2009

18.04.09 - 30.07.09 Bhongir,India

Nearly for two months there to start up the operation.